Grand Opening of PETRONAS Twin Towers, The Worlds Tallest Towers
Production schedule
6 months
Concept / Strategy
"A Vision Realized" coined to showcase the towering ambition of our country to become a developed Nation and to prove to the world that we are equally capable of achieving great things.
An outdoor evening celebration
Engineering feat
Designing and erecting the worlds largest sky screen that was suspended below the sky bridge between the Towers to showcase The journey, Malaysia�s Rich Cultural heritage, its peoples, its Vision etc.
To light up 88 floors of the Twin Towers. (220,000 volts of electricity was generated to power projection and lighting systems)
Technologies
The use of high end large frame multi media presentation to Project images onto the facade of the towers and sky screen.
Special effects
Specially choreographed time coded lighting /projections and pyrotechnics display to synchronize with the musical score specially produced for the events culmination.
Production crew
Approximately 500 pax. Comprising of Malaysians and a host of International specialized service providers from Italy, Australia, United Kingdom, USA , Singapore, France, Hong Kong, Germany & Japan
Targeted audience
Primary
Malaysians throughout the country
Approximately 1000 invited guests and dignitaries
The masses including International Travelers who were in Malaysia gathered around the vicinity (approximately 500,000) to witness the grand opening.
Secondary
The world at large (The event was carried live through all electronic media in Malaysia and several other Countries)